We are professional 39NiCrMo3 34CrNiMo4 Forged/Forging Steel Forging Rings Shafts Flat Round Bars Sleeves Bushes Bushing Discs Disks Blocks Pipes Tubes Hollow bars shells barrels factory from china
Chemical analysis -% by mass
Chemical elements |
C |
Si |
Mn |
P |
S |
Cr |
Mo |
Ni |
%, by mass |
0,35 - 0,43 |
0,40 |
0,50 - 0,80 |
max 0.025 |
max 0,035 |
0,60-1,00 |
0,15-0,25 |
0,70-1,00 |
Permissible deviation |
± 0.02 |
± 0,03 |
± 0,04 |
+ 0.005 |
+ 0.005 |
± 0.05 |
± 0.03 |
± 0.05 |
Mechanical properties in the quenchedand tempered condition
|
d ≤ 16mm oder t ≤ 8mm |
16mm < d ≤ 40mm
8mm < t ≤ 20mm |
40mm < d ≤ 100mm
20mm < t ≤ 60mm |
100mm < d ≤ 160mm
60mm < t ≤ 100mm |
160mm < d ≤ 250mm
100mm < t ≤ 160mm |
Re min (MPa) |
785 |
735 |
685 |
635 |
540 |
Rm (MPa) |
980-1180 |
930-1130 |
880-1080 |
830-980 |
740-880 |
A min. (%) |
11 |
11 |
12 |
12 |
13 |
Z min. (%) |
40 |
40 |
45 |
50 |
50 |
KV min. (J) |
35 |
35 |
40 |
40 |
40 |
The Process As Follow: ingot → heat → forging → heat treatment(normalizing+tempering) → inspection → rough machining → UT → 2nd heat treatment → finishing machining → inspection .
Quality Control: UT,MT,RT,PT,chemical composition test,mechanical property test,etc.
Heat Treatment: Normalize,Quenching,Tempering,Anealled.
Surface Treatment: painting,plating,polishing,black oxide,transparent anti-rust oil.
Inspection: Besides our in-house inspecion, you could also choose a third party inspection.
Standard: ANSI,ASTM,ASME,API,JIS,DIN,BS,EN,KS,UNI,SABS,GOST.
Certificate: 1, Raw material certificate(material chemical compositon)
2, Heat treatment sheet report
3, Dimension inspection report
4, UT test report
Packing: Seaworthy plywood packaged on stell pallets or as customer's request
Delivery Date: Decided by the amount and dimensions of products. Usually we control the large diameter rings' delivery time within 5 weeks after we receive your formal order.
Competitive Advantage: Quality control and management to the whole produce process, including ingot smelting,forging, heat treatment, machining and strictly final inspection prior to delivery.